Saturday, June 2, 2012

Belly Tanker - Bonneville Salt Flats 2012

Well the Belly tanker is almost completed to attend the Nationals in Bonneville this August. A little more work on the front suspension and radiator, then the GMC 302, Straight Six, (Jimmy),
will be singing once again... What was the old saying, "Eight For Show and Six For Go"

Speed Blisters, Humps & Bumps

A few hours on the sand bag and planishing hamer and I have four convace pieces made for the foot area in my Bonneville Belly Tanker. The convace peices will be bolted onto the nose of the cage, inside of the tank to prevent your feet from exitting the cage in the event of a roll over.... Working on a couple of speed blisters currently for another project, pictures of the speed blisters at a later date. One of my favourite pictures of a Belly Tanker and push truck from the good 'ole days.....
...

Sunday, May 13, 2012

Steering & Brakes, Just Some Recent Work

Wilwood Pedals cut and reworked, then a seco
nd hot rod with a Schroeder Box with Ansen Pedals ! Cowl Steering with Ansen Pedals, once again pedal arms will have to be re-worked.....

Thursday, April 26, 2012

Gow Job Leaves The Candy Factory

Finished another Hot Rod at the Candy Factory. Off to a new home. Gotta' love those those speakers on that hemi !!!! See 'ya buddy......

Saturday, March 31, 2012

Who We Are, What We Do, All For The Love of "Hot Rods"

Candy's Hot Rod Supply :

The mission of our little, but mighty business, is to provide the least expensive hot rod parts in Canada (same price at my shop or shipped directly to your door), while providing free advise as no purchase is necessary ! We have proudly built award winners as pictured earlier in this site. Free appraisals on all builds, $75.00 plus tax for all other customers !

No job is too big or too small !

Stop by anytime as we are located just north of Kingston, Ontario, however; call first to ensure we will be in the shop and not at a hot rod show or nostalgic racing event.

SHOP RATE : $37.00 / hour plus tax and supplies.

Remember, advise is always free as everything is cheaper in the country !

SHOP # (613) 353-7572

New Skins For the Deuce Doors...






Bottom 6" of both Deuce doors were missing, as all inner frame work had returned to Mother Nature. After rebuilding the door bottoms and inner frame work, new lower door skins have been tacked into place. Final welding will be completed after the door is once again fitted to the opening to ensure proper alignment.

Friday, March 16, 2012

New Metal & Patch Panels in the Deuce






Patch panels and welding on a 5 window Deuce for a customer. By the time all metal has been completed, approxiamtely 60% of the car will be new metal. Every Deuce is worth saving ! Enjoy....

Saturday, February 18, 2012

Hot Rod Speakers !





Hot Rod Speakers..... Well maybe not speakers in the traditional sense with licks crafted by SRV or Billy Gibbons, however; music of a 331 Chrysler Hemi ! Some of the latest out of the Candy Factory...

Sunday, January 22, 2012

Louvers and More Louvers




Recently louvered a 1941 Willys Coupe hood and a Ford Deuce original hood. Over 200 old time, 2 1/2" wide round top, louvers in total. For some reason, due to my limited ability in photography, the short row of louvers in the passenger side portion of the Deuce hood appear out of line. Well they are dead straight... Each row and column of louvers are near perfect in alignment, when looking down or across the hood. Wish I knew more about photography and back lighting for pictures.
The majority of the time is spent on the layout for the louvers, on the inside of the hoods ! Cheers !

Friday, January 6, 2012

Deuce Cowl Patch Panels




Finished hammer welding two cowl patch panels in the Deuce 5 window. Slow but steady progress as the entire floor including sub-rails have been replaced in this Deuce. Just my opinion, every Deuce is worth saving. Enjoy !

The first picture is the passenger side cowl patch welded into place, which still requires the paint to be removed, then some light hammer and dolly work.

The second picture, is of the drivers side cowl completed.

The third picture, is of the drivers side cowl rust removed, before the new cowl patch was installed....

Monday, December 19, 2011

Deuce Doors, Repairing the Missing Bottoms !




Cutting out the rot, rebuilding the missing Deuce door bottoms.... You will notice a piece of metal (Rot) removed from the bottom / side of doors, which has been welded on, patched and covered with metal. These patches over patches have been removed to restore the original door bottom.....

Feeling Blue, Never !





Some progress pic's of the '33 sitting on the chassis with custom motor mount covers turned out on our lathe. Just for a little bling to customers cars, plate toppers, which just arrived ! Enjoy.....

Wednesday, December 14, 2011

Tradition Continues - Hot Rod Art of Jeff Norwell





Some recent pieces of art created by Jeff Norwell. In the near future, we will recognize Jeff as a house hold name, in the world of hot rod art.... Already I would consider Jeff to be in the top ten artists, however; Jeff also walks the walk, driving around his Deuce and currently gathering parts for numerous other kool projects. More on his projects at a later date, so for now, enjoy the world as seen through Jeff's eyes !

Tuesday, November 29, 2011

Hot Rod Bolt Covers & Transmission Spacers





We machined a couple of motor mount, bolt covers, which will add a little bling to a already jeweled, 331 Chrysler Hemi. We also had to machine a spacer, as referred to below, for a 4 speed manual transmission mated to the 331 Elephant Motor (Chrysler Hemi). A nice knurled edge was added to the spacer to add a little, "unseen" detail..... Remember when installing your hydraulic throw out bearing, leave at least .100" of clearence between the bearing and the pressure plate.....